First and foremost, we are committed to cultivating a safety-first culture, and a safe environment for our team members, clients, and community.
– Subsurface Utilities Engineering (SUE)
– Public and Private Utilities Coordination and Conflict Analysis
– Public and Private Utilities Engineering
– Dry Utility Manhole and Pole Fielding
– Utility Pole Loading (Structural) Analysis
– Utility Underground Duct Bank Design for New Installs and Relocations
– Telecom Outside Plant (OSP) Planning and Design
– Broadband Infrastructure Upgrades
– Telecom Equipment and Wireline Pole Attachments Design and Permitting
– Conventional and HDD Bore Design
– TXDOT Right-of-Way utility coordination
– Land surveying, and Records Research
– Utilities Coordination and Conflict Analysis
– Traffic Control Plans
– SWPPP
– Opinion of Probable Construction Cost
– Local, State, and Federal Permitting
– Bidding and Construction Phase Services
– Records Drawings
– Supporting public and private broadband initiatives, utility relocation, and corridor-based fiber deployment projects
– TCP Program Management for field operations and maintenance crews (For utilities, municipalities, developers, and contractors)
– On-Call TCP Consultant, Tracking, and QA/QC
– Site Visit, Existing Condition Assessments, Safety Analysis, Traffic Data Research, and Field Data Collection and Measurements
– Traffic Control Plan Design for Urban, Residential, and Rural Areas (MUTCD, City, County, and State Standards)
– Right-of-Way Conflict Resolutions
– Right-of-Way Access Permitting
– Local, State, Railroad, and County Permitting
– Opinion of Probable Construction Cost
– Coordination with TCP Devices Installers
– Land surveying, Subsurface Utility Engineering (SUE), and Records Research
– Platting, Subdivision and Site Development Plans
– Property Condition Assessment and Report
– Environmental Assessments and Coordination
– Utilities Tap Plans and Service Extensions (SER) Design and Coordination
– Utilities Coordination, Design and Permitting
-Data Center Power and Fiber coordination, Utility Feasibility Studies, Service Extensions, Conflict Analysis, and Multi-jurisdictional Permitting
– ADA Accessibility and Compliance Design
– Traffic Control Plans (TCP) and Stormwater Pollution Prevention Plans (SWPPP)
– Opinion of Probable Construction Cost (OPCC)
– Local, State and Federal Agency Permitting
– Bidding and Construction Phase Engineering Service
– Pole Attachments Program Management
– Wireless and Wireline Pole Attachment Applications Reviews, Pre-Construction Inspection, Post-Construction Inspection, and Aerial Route Feasibility
– License Agreements Drafting, Coordination with Licensees, and Meetings Facilitation
– NJUNs Notifications Processes
– Pole Surveys, Field Data Collection, and Mapping via Katapult or OCALC
– Fiber/ Cable Communications Make Ready Design per NESC and Power Utility Requirements
– Wood and Steel Pole Loading (Structural) Analysis
– Bill of Materials (BOM)
– Technical Specifications and construction standard details
– Construction Phase Services, Review Submittals and RFI Responses
– Record Drawings, Document Control, GIS Mapping, and Asset Management
– Power Utilities and Developers Meeting Facilitation, Coordination, and Project Management
– Battery Storage Utilities Drawings
– EV Chargers Site Assessments, and Site Plans
– EV Chargers Utilities Service Connections Design, Coordination, and Permitting
– Electric Distribution Overhead and Underground Design, Coordination, and Permitting
– Subsurface Utilities Engineering (SUE)
– Utilities Coordination and Conflict Analysis
– Water and Wastewater Route Feasibility and Engineering Report
– Water and Wastewater Tap Plans
– Pipelines Technical Specifications and Details
– Water and Wastewater Renewals Design, Construction Drawings, Bid documents, and Construction Phase Services
– Wastewater Trenchless Renewals by Cured in Place Pipe (CIPP), Slip lining, or Pipe-bursting, and By-pass pumping
– Conventional and Trenchless Bore Pipe Design
– Land surveying, SUE (level D – A), and Records Research
– Traffic Control Plans and SWPPP
– Opinion of Probable Construction Cost
– Local, State, and Federal Permitting
– Bidding and Construction Phase Services
– Residential and Commercial Site Development Turnkey Permitting
– Building Permits
– Applications for Utilities Services (Power, Gas, Telecom, and Water/Wastewater)
– City of Austin Permitting Processes:
– Public Project Review Process
– Excavation Permit
– General Permit
– Traffic Control Review Application
– Temporary Use of Right-of-Way (TURP)
– Water/Wastewater Tap Plan
– Site Plans (Commercial, Residential, Exemptions)
– Building Permits
– Small Cell (Network Node) Permits
– Tree Permit
– Austin Energy Pole Attachments Applications
– Austin Energy Electric Service Planning Application (ESPA)
– Texas Department of Transportation (TXDOT) Permits
– Right-of-Way Permits (RULIS Application Process)
– Texas Commission on Environmental Quality (TCEQ) Permits
– Domestic Wastewater Permit Application
– Texas Pollutant Discharge Elimination System (TPDES) Permits
– Texas Land Application (TLAP) Permits
– Edwards Aquifer Protection Plans



