Regulatory update · June 23, 2026 | Revised October 7, 2026
REGULATORY UPDATE · 89th Texas Legislature, 2025
Our team has worked for Texas utilities all over the state for over two decades, and we have continuously been impressed by the innovation, advanced maintenance and operations, high-quality customer service, and most importantly their strong health, environment, and safety cultures. So, for decades, Texas had no statewide requirements governing how electric utilities inspect, maintain, or replace their distribution and transmission poles. For the power and telecommunication utilities, we have used the National Electric Safety Code (NESC) as the national standard to follow on our projects, unless of course a utility had their own standards that are typically more stringent than NESC.
This is changing because of mother nature’s inclement weather that has been causing damage to our grid, from long freezes to severe wildfires. The State of Texas passed legislation to strengthen our infrastructure and protect our communities.
The 89th Texas Legislature passed two companion bills that together establish the most comprehensive mandatory pole inspection and management framework in the state’s history. House Bill 144 took effect June 20, 2025. Senate Bill 1789 followed on September 1, 2025. Together, they establish requirements applicable to electric utilities, electric cooperatives, and municipally owned utilities distributing electric energy to the public in Texas.
If your utility owns distribution poles in Texas, you are required to comply. And the clock is already running.
Why These Laws Were Passed
The cause of these laws is documented and confirmed. A decayed utility pole broke and caused power wires to fall on dry grass in the Texas Panhandle on February 26, 2024, igniting the Smokehouse Creek Fire. A Texas A&M Forest Service investigation report and a Texas House committee inquiry both confirmed the cause. The fire burned 1,058,482 acres, making it the largest wildfire in Texas history. Two people died, 138 homes were destroyed, more than 15,000 head of cattle perished, and hundreds of water wells were damaged. A decayed pole, a preventable failure, caused it all.
The Texas House committee that investigated the fire found that other poorly maintained power equipment sparked four additional fires in the same region. The committee recommended that the Legislature require more effective monitoring and accountability with utility providers when it comes to inspecting and replacing power poles.
The 89th Legislature acted on that recommendation. HB 144 and SB 1789 are the direct result, shifting Texas from reactive pole management to systematic, evidence-based, and regulator-reviewed programs. The intent is to find failing poles before the next fire, not after.
HB 145, also enacted following the 2024 Panhandle wildfires, creates a related but separate framework for utility wildfire mitigation planning and risk management. While HB 145 is broader than pole inspection and structural integrity, utilities should consider how their pole management and inspection programs under HB 144 and SB 1789 support their overall wildfire mitigation strategy. HB 145 introduces additional requirements that warrant a separate discussion and will be covered in a future article.
Two Laws, One Framework
HB 144 and SB 1789 work together. They are not redundant. They address different but complementary obligations.
HB 144 is the management and process law. It requires every covered utility to develop, file, and maintain a formal Distribution Pole Management and Inspection Plan with the PUCT. The plan must document how your utility identifies, inspects, tracks, and repairs poles across your entire distribution system. It is a compliance program, not just a report.
SB 1789 is the technical standards law. It authorizes and directs PUCT to adopt binding statewide structural integrity standards for transmission and distribution poles, including a uniform classification system for assessing pole serviceability. Where HB 144 governs the process, SB 1789 governs the technical bar your poles must meet.
SB 1789 has now been implemented through final PUCT Rule 16 TAC §25.61, Transmission and Distribution Pole Structural Integrity Standards. The rule becomes effective October 8, 2026.
PUCT Rule 16 TAC §25.63, Distribution Pole Management and Inspection Plans, has also been adopted as the final implementing rule for HB 144. Adopted under PUCT Project No. 59431, the rule establishes plan content, filing format, filing deadlines, and annual compliance update requirements.
Who must comply
HB 144 Section 38.103(a) states that compliance is required of each of the following, with no exemption for system size or geography:
- Electric cooperatives
- Electric utilities
- Municipally owned utilities
That means every power utility in the State of Texas. If your entity distributes electric energy to the public in Texas, and you own distribution poles, you are required to file.
The term electric utility in §38.103(b)(6) carries the definition established in Texas Utilities Code §31.002, which applies to investor-owned utilities and river authorities. Electric cooperatives and municipally owned utilities are separately defined and treated as distinct entity classes throughout the Texas Utilities Code. HB 144 uses all three terms independently and intentionally. Utilities should confirm their entity classification and consult legal counsel for guidance on how that classification affects their specific obligations under §38.103(b)(6).
What the Final HB 144 Rule Requires: Plan Filing Format and Eight Required Elements
Final PUCT Rule 16 TAC §25.63(c)-(d) establishes both the filing format and required contents of the Distribution Pole Management and Inspection Plan. The plan must be filed in the control number designated by Commission Staff as a searchable PDF. All included tables must also be submitted in Microsoft Excel format with formulas intact. The plan must contain the following eight elements:
1. Entity Information
The entity’s legal name, form of organization, and certificate of convenience and necessity (CCN) number.
2. Scope and Objectives
A statement of the plan’s scope and objectives for ensuring public safety through the effective management, inspection, maintenance, and repair of structures operating at distribution-level voltage.
3. Compliance Monitoring Methods
A description of the entity’s methods for monitoring compliance with the plan.
4. Roles and Responsibilities
A list of the roles and responsibilities of individuals responsible for overseeing and executing the plan. Personally identifiable information must be excluded.
5. Inspector Training and Certification Processes
A description of the entity’s processes for training and certifying personnel, or for verifying the training and certification of third-party vendors, who inspect structures operating at distribution-level voltage.
6. Landowner Complaint Handling
A description of the entity’s processes for documenting and responding to a report or complaint made by a landowner regarding the condition or repair of a structure operating at distribution-level voltage.
7. Inspection and Corrective-Action Timeline
An estimated timeline for completing any inspections and corrective actions required by the standards adopted under PURA §38.006 for structures operating at distribution-level voltage.
8. Estimated Implementation Costs – Electric Utilities Only
For a plan submitted by an electric utility, the estimated cost of implementing the plan must be presented for each calendar year as capital expenditures, operations and maintenance (O&M) costs, and total costs. This plan-content requirement applies specifically to electric utilities.
A plan that omits a required element or does not follow the prescribed filing format may not satisfy final 16 TAC §25.63.
Annual Updates: What HB 144 §38.103(c) Requires
Filing the initial plan is not a one-time event. Under adopted 16 TAC §25.63(e), an entity with a plan on file must submit an annual compliance update to PUCT no later than May 1 of each year. The update must address the prior calendar year and include the information required by the adopted rule.
- The entity’s compliance with the plan’s objectives
- The costs of implementing the plan to date
- The results of inspections of structures operating at distribution-level voltage under the standards adopted under PURA §38.006, including the number of structures inspected and corrective actions taken
PUCT clarified in the final rulemaking that the annual reports required by §25.61 and §25.63 have different scopes and obligations. The Commission declined to establish a single consolidated report for both rules, although substantially similar information required under other law may be used to satisfy certain §25.63 requirements when the filing identifies the requirement being fulfilled and explains why the information is substantially similar.
Final Rule Filing Requirements and Plan Updates
The final §25.63 keeps January 1, 2027 as the deadline for the initial plan. Plans must be filed in the PUCT control number designated by Commission staff as a searchable PDF, with included tables also submitted in Microsoft Excel format with formulas intact. Subsequent periodic plans are due May 1 every eighth year, beginning in 2032 for electric utilities, 2034 for municipally owned utilities, and 2036 for electric cooperatives. A plan may also be required by May 1 if specified plan information changed during the prior calendar year.
The Compliance Timeline
The table below reflects the statutory deadlines and the final filing schedules established by adopted 16 TAC §§25.61 and 25.63.
Deadline | Requirement | Who |
June 20, 2025 | HB 144 effective | All covered utilities |
September 1, 2025 | SB 1789 effective | All covered utilities |
May 1st, annually | Annual update due to PUCT | All covered utilities |
January 1, 2027 | Initial plan due to PUCT (hard deadline) | All covered utilities |
January 1, 2028 | Affidavit that the initial plan complies with the standards adopted under PURA §38.006, or a revised plan that complies with those standards (16 TAC §25.63(c)(1)(B)) | All covered utilities |
Every 8 years thereafter | Periodic plan due beginning May 1, 2032 for electric utilities; May 1, 2034 for municipally owned utilities; and May 1, 2036 for electric cooperatives (16 TAC §25.63(c)(2)(A)) | Covered entity class; starting year varies |
January 1, 2027 is the required deadline for the initial plan. Do not wait until late 2026 to file.
What SB 1789 Requires: The Structural Integrity Standards
PUCT has adopted final 16 TAC §25.61, Transmission and Distribution Pole Structural Integrity Standards, under Project No. 59432. The rule becomes effective October 8, 2026 and establishes statewide inspection cycles, a uniform serviceability grading system, corrective-action timelines, record-retention requirements, and annual reporting.
- A uniform serviceability grading system of Pass, Remediate, Replace, and Emergency for structures inspected under the rule
- Routine inspection cycles based on voltage level, construction material, and geography: transmission wood structures require annual visual inspections and comprehensive inspections at least every 10 years; transmission non-wood structures require annual visual inspections and comprehensive inspections at least every 12 years; distribution wood structures require comprehensive inspections at least every 8 years in coastal counties and every 10 years in non-coastal counties; distribution non-wood structures require comprehensive inspections at least every 12 years
- Post-event visual inspections for structures affected by a qualifying event as soon as practicable, but no later than 45 calendar days after the qualifying event ends or service is restored at the structure, whichever occurs later
- Corrective-action timelines tied to the assigned grade: Remediate generally within 6 months; Replace generally within 12 months; and Emergency make-safe action as soon as practicable but no later than 2 calendar days after the Emergency grade is assigned or the structure becomes safe to access, whichever occurs later. The rule provides notice-based extensions in specified circumstances, up to 12 months for remediation and 24 months for replacement
- Service-life record retention for each structure, including identification, physical and design characteristics, inspection history, assigned grades, reasons for non-Pass grades, and corrective actions
- Annual reporting by May 1 on inspection, serviceability grading, and corrective-action activities and results for the prior calendar year
Critically, the January 1, 2027 deadline remains the deadline for the initial HB 144 management plan under §25.63. SB 1789 now operates through final §25.61. Municipally owned utilities and electric cooperatives must adopt the inspection, grading, corrective-action, and record-retention requirements specified in §25.61 within 120 days after the rule’s October 8, 2026 effective date and file the required attestation with their first annual §25.61 report after adoption.
Utilities should now shift from monitoring rulemaking to implementation: aligning inspection cycles and field procedures with §25.61, establishing the required grading and corrective-action workflow, retaining the required structure-level records, and coordinating those requirements with the HB 144 management plan and annual reporting process.
Where to Find the Official Documents
The laws themselves are on the Texas Legislature Online at capitol.texas.gov. Search for HB 144 and SB 1789 in the 89th Legislature (2025) to find the enrolled bill text, bill analyses, and fiscal notes. Texas Utilities Code §38.103, as added by HB 144, is the controlling document.
PUCT Interchange at interchange.puc.texas.gov is where all filings, proposed rules, and commission orders are publicly accessible. Key project numbers:
- Project 59287: CY 2026 annual reporting project under PURA §§38.006(e), 38.101(a), and 38.103(c). Commission staff guidance allowing consolidated 2026 reporting was expressly limited to 2026 while the implementing rulemakings were pending.
- Project 59431: HB 144 / 16 TAC §25.63 Distribution Pole Management and Inspection Plans rulemaking project.
- Project 59432: SB 1789 / 16 TAC §25.61 Transmission and Distribution Pole Structural Integrity Standards rulemaking project. The final adopted rules are available through the Texas Register and PUCT Interchange.
National standards for reference: NESC/IEEE C2 at standards.ieee.org and USDA RUS Bulletin 1724E-200 at rd.usda.gov.
HB 144 Compliance: What Texas Utilities Should Be Doing Now
The January 1, 2027 deadline is approaching quickly, and many Texas utilities are discovering that compliance involves significantly more than simply conducting pole inspections. Utilities must establish documented programs, maintain defensible records, implement reporting processes, and align their programs with the final statewide structural integrity standards.
For organizations that do not already have a mature pole management program in place, developing a compliant framework can require substantial planning, coordination, and resource allocation.
Utilities should evaluate their current level of readiness and identify gaps that could affect compliance, operational efficiency, and future reporting obligations.
Organizations that are navigating this transition most effectively are those that have already started.
UPDATE: Final SB 1789 Structural Integrity Standards Adopted
As of this October 7, 2026 revision, PUCT has adopted final 16 TAC §25.61 under Project No. 59432. The rule becomes effective October 8, 2026. Utilities now have final statewide requirements for inspections, serviceability grading, corrective actions, record retention, and annual reporting.
The HB 144 management plan and SB 1789 structural standards should now be implemented together. The initial §25.63 plan remains due January 1, 2027, and the final §25.61 requirements should be incorporated into inspection procedures, corrective-action tracking, records, and the plan’s inspection and corrective-action timeline.
Aeparmia Engineering is actively supporting utilities as they move from rulemaking into implementation of both HB 144 and SB 1789, including development of §25.63 plans and alignment of pole inspection, grading, remediation, replacement, recordkeeping, and reporting processes with final §25.61.
How Aeparmia Helps Texas Utilities Achieve HB 144 Compliance
Aeparmia Engineering helps electric utilities, electric cooperatives, and municipally owned utilities across Texas develop practical, scalable pole management and attachment programs that support compliance, operational efficiency, and system reliability.
Whether you serve a small rural community or a large urban service territory, our team can help develop and implement:
- HB 144 Distribution Pole Management and Inspection Plans
- Pole inventories, audits, inspections, and remediation tracking
- Standard pole attachment license agreements, construction details, and technical guidelines
- Digital pole attachments application forms, and notification processes, including NJUN integration for joint-use notification
- Pole attachment program management and compliance programs
- Engineering and professional services for design, permitting, bidding and construction services
- Annual reporting, program management, and regulatory support
Drawing on our experience supporting utilities such as Lubbock Power & Light, Bryan Texas Utilities, Austin Energy, CPS Energy, and GAATN, we provide the engineering, field services, and program management needed to build sustainable, compliant utility programs anywhere in Texas.
From initial planning to ongoing program administration, Aeparmia serves as a trusted partner for utilities of all sizes. For utilities facing the January 2027 HB 144 deadline, we are ready to support you immediately.
the bottom line
Texas utilities now operate under mandatory, enforceable pole inspection requirements for the first time in state history. The law is clear. The eight plan elements are specific. The January 2027 deadline is fixed.
A decayed pole caused the largest wildfire in Texas history. HB 144 and SB 1789 are the Legislature’s response. Every utility in Texas, large or small, rural or urban, investor-owned or community-owned, now has the same obligation: build a plan, file it, execute it, and report on it every year.
The utilities navigating this transition most effectively are those that have already started. With both implementing rules now adopted, utilities can build the HB 144 management plan and align their inspection, grading, corrective-action, recordkeeping, and reporting programs with the final SB 1789 structural standards.
If your utility has not yet assessed its readiness for HB 144 compliance, now is the time to start.
Aeparmia Engineering understands how critical and complex this work can be. We are here to listen to your utility’s needs and support you through the compliance process at whatever stage you are starting from.
About the Author
Mia Diya-Bernhard, P.E., PMP is the President and CEO of Aeparmia Engineering, PLLC (TBPELS Firm No. 19271), a Texas-based civil engineering firm specializing in utilities infrastructure. Aeparmia serves electric utilities, electric cooperatives, and municipally owned utilities across Texas from offices in Austin, San Antonio, and Lubbock.
For questions, contact us directly through our website.
Sources: Texas HB 144 enrolled bill text, 89th Legislature (2025); Texas Utilities Code §38.103; Texas SB 1789 enrolled bill text, 89th Legislature (2025); Texas Utilities Code §38.006; Texas A&M Forest Service Smokehouse Creek Fire investigation report, March 2024; Texas House committee report on Panhandle wildfires, May 2024; PUCT Interchange Projects 59287, 59431, and 59432; adopted 16 TAC §25.63, Distribution Pole Management and Inspection Plans; adopted 16 TAC §25.61, Transmission and Distribution Pole Structural Integrity Standards; Texas Utilities Code §31.002 definitions.